Search Results

Keyword:SPECT

U.S. Customs and Border Protection Awards OSI Systems $85 Million Contract for Mobile X-Ray Inspection Systems

U.S. Customs and Border Protection Awards OSI Systems $85 Million Contract for Mobile X-Ray Inspection Systems

On August 19, 2026, OSI Systems announced that its Security division has been awarded a five-year indefinite delivery/indefinite quantity contract by U.S. Customs and Border Protection, with a ceiling value of approximately $85 million. Under the contract arrangement, OSI Systems will provide U.S. Customs and Border Protection with van-mounted mobile Rapiscan X-ray inspection systems for baggage and parcel screening. The company stated that the initial task order under the contract is valued at approximately $21 million, covering the delivery of mobile inspection systems and training for relevant operators. Ajay Mehra, President and CEO of OSI Systems, stated that this multi-year contract reflects the company's commitment to providing technology support for border security and demonstrates the capabilities of its mobile inspection product portfolio. The company will continue to work with U.S. Customs and Border Protection to deploy mobile screening platforms and provide customs and border officers with the necessary equipment and training.

2026-08-21

22 Atmospheric Radiation Automatic Monitoring Stations in Shaanxi Operate Stably, with National-Controlled Stations Achieving 99.9% Data Acquisition Rate

22 Atmospheric Radiation Automatic Monitoring Stations in Shaanxi Operate Stably, with National-Controlled Stations Achieving 99.9% Data Acquisition Rate

In recent years, Shaanxi Province has continuously strengthened the construction of its radiation environmental monitoring network. The 22 atmospheric radiation automatic monitoring stations across the province, including 12 national-controlled stations and 10 provincial-controlled stations, have maintained stable operation. These stations utilize high-pressure ionization chambers, ultra-high-flow aerosol samplers, gamma spectrometers, and other equipment to conduct continuous monitoring of atmospheric instantaneous gamma dose rates, aerosol samples, and gamma radionuclides. Relevant data are transmitted in real time to the system platform of the Shaanxi Provincial Nuclear and Radiation Safety Supervision Station. According to reports, Shaanxi has gradually established an automatic station operation and maintenance management system featuring strong organization, closed-loop responsibility, funding guarantees, standardized procedures, and digital-intelligent empowerment. In 2023, the 5-minute data acquisition rate of Shaanxi's 12 national-controlled stations reached 99.9%, ranking third nationwide.

2026-08-21

Automatic Radiation Environment Monitoring Station in Mianyang, Sichuan Put into Trial Operation, with Core Equipment and Systems Achieving Domestic Localization

Automatic Radiation Environment Monitoring Station in Mianyang, Sichuan Put into Trial Operation, with Core Equipment and Systems Achieving Domestic Localization

Recently, the automatic radiation environment monitoring station located within the Nuclear Medical Health Industrial Park of the China (Mianyang) Science and Technology City was officially put into trial operation. As the first automatic radiation environment monitoring station in Sichuan Province to fully achieve domestic localization of core equipment and systems, it will provide radiation environment safety assurance for the development of the nuclear medical industry in the park through 24-hour uninterrupted automatic monitoring capabilities. At the automatic radiation environment monitoring station, operational data from equipment such as environmental γ dose rate monitors are updated in real time on monitoring screens. Compared with the previous approach that relied on manual on-site sampling and batch laboratory analysis, the automatic station enables continuous monitoring, reducing the time required to produce monitoring results from several days to the same day, thereby improving...

2026-08-20

Wiley Launches Spectroscopy Analysis API Portfolio in the U.S., Enabling Rapid Identification of Unknown Compounds

Wiley Launches Spectroscopy Analysis API Portfolio in the U.S., Enabling Rapid Identification of Unknown Compounds

HOBOKEN, N.J. — Wiley recently announced the launch of its spectroscopy analysis Application Programming Interface (API) portfolio, opening its spectral data, analytical algorithms, and predictive models to laboratories, instrument vendors, and software platforms to help users identify and verify unknown compounds faster within their own workflows. According to the company, Wiley has long been building scientific reference databases, with its spectral data applied across pharmaceuticals, forensics, environmental science, chemistry, food, and materials. The newly launched API portfolio aims to integrate these databases and analytical tools into more modern software environments, enabling laboratories to incorporate high-quality spectral information directly into existing...

2026-08-20

UNESCO Expert Mission Inspects Environmental Remediation Project at Former Baikal Pulp and Paper Mill in Russia

UNESCO Expert Mission Inspects Environmental Remediation Project at Former Baikal Pulp and Paper Mill in Russia

On August 19, 2026, a monitoring mission for the Lake Baikal World Heritage Site, comprising experts from UNESCO and the International Union for Conservation of Nature, inspected the cumulative environmental damage remediation work carried out by Federal Environmental Operator, a subsidiary of Rosatom, at the former Baikal Pulp and Paper Mill site. At the former plant area, the experts were briefed on progress in sludge treatment, alkaline wastewater treatment, and nature-based remediation technologies. The relevant projects primarily target historically accumulated pollution, with the goal of reducing the risk of pollutants entering Lake Baikal. During the visit, the infrastructure at the Babushinsky landfill and the former wastewater treatment plant had been completed and entered the commissioning phase. The...

2026-08-19

Acceptance Inspection Completed for Auxiliary Pump Equipment at Egypt's El Dabaa Nuclear Power Plant

Acceptance Inspection Completed for Auxiliary Pump Equipment at Egypt's El Dabaa Nuclear Power Plant

A milestone in equipment quality control has been achieved at the construction project of the El Dabaa Nuclear Power Plant, Egypt's first nuclear power station. Recently, SpetsAtomResurs LLC, a Russian limited liability company, completed acceptance testing and final acceptance inspection of six auxiliary pump units at its production facility in Moscow, with the relevant equipment having passed pre-delivery quality confirmation. This quality control work was carried out from June 18 to July 21, 2026, fulfilling the supply obligations of SpetsAtomResurs LLC under the agreement concluded with JSC Atomstroyexport, the general contractor for the nuclear power plant construction. The equipment manufacturing and verification work was carried out in accordance with the established quality plan.

2026-08-19

US OSI Systems Secures Approximately $200 Million Contract for Mobile Vehicle Inspection Systems

US OSI Systems Secures Approximately $200 Million Contract for Mobile Vehicle Inspection Systems

On August 17, 2026, OSI Systems, Inc. announced that its Security division has been awarded a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract by U.S. Customs and Border Protection (CBP), with a ceiling value of approximately $200 million. Under the contract, OSI Systems will provide CBP with mobile Rapiscan® passenger vehicle inspection systems. The company stated that the initial task orders under the contract include the first batch of systems, along with related services and training content. Ajay Mehra, President and Chief Executive Officer of OSI Systems, stated that this contract will enable the company to continue supporting CBP in deploying vehicle security inspection systems. The Rapiscan mobile inspection systems help users flexibly allocate resources in response to changing on-site requirements, supporting border security and critical infrastructure protection efforts.

2026-08-18

Russian Segment of ISS Adjusts BTN-M2 Equipment Configuration, Continues Neutron and Gamma Radiation Observations

Russian Segment of ISS Adjusts BTN-M2 Equipment Configuration, Continues Neutron and Gamma Radiation Observations

On August 13, 2026, during the ISS-75 expedition mission, Russian cosmonauts Pyotr Dubrov and Anna Kikina performed configuration adjustments to the BTN-M2 scientific equipment inside the Nauka module of the Russian Segment of the International Space Station. Figure 1. Profiles of gamma rays (energies below 500 keV, black curve), 511 keV photons from electron-positron annihilation (green curve), and high-energy neutrons (red curve) detected by the BTN-M2 instrument aboard the ISS on July 30–31, 2026. Red arrows indicate enhanced gamma-ray flux during the solar proton event (SPE) as the ISS passed over high-latitude regions of the Earth...

2026-08-18

What "Hardcore" Technologies Lie Behind the Nuclear Power Plants Inspected by the Minister of Ecology and Environment?

What "Hardcore" Technologies Lie Behind the Nuclear Power Plants Inspected by the Minister of Ecology and Environment?

From August 14 to 15, Huang Runqiu, Minister of Ecology and Environment, conducted a research tour on ecological and environmental protection work in Lishui, Taizhou, and Ningbo cities of Zhejiang Province. Actively, safely, and orderly developing nuclear power is an important measure for building a clean, low-carbon, safe, and efficient energy system and for achieving carbon peak and carbon neutrality. Huang Runqiu visited the Sanmen Nuclear Power Plant in Taizhou, going deep into the main control room of the operating unit and the nuclear island building of the unit under construction, to learn in detail about the operating status and construction progress of the nuclear power units, and to express gratitude to the on-site supervision personnel of the East China Nuclear and Radiation Safety Supervision Station. Ensuring the construction quality of nuclear power units is crucial to enhancing the safety level of nuclear power plants. Huang Runqiu then visited the Jinqimen Nuclear Power Plant in Ningbo, where he inspected the nuclear island foundation area to review the construction progress of the plant and engaged in on-site exchanges with nuclear safety supervision personnel.

2026-08-18

Radioactive liquid waste leak suspected at QST's underground facility in Chiba due to record rainfall

Radioactive liquid waste leak suspected at QST's underground facility in Chiba due to record rainfall

According to Japanese media reports, due to record-breaking rainfall in Chiba Prefecture, an underground facility of the National Institutes for Quantum Science and Technology (QST) in Chiba City was flooded, and radioactive liquid waste in underground storage tanks at the facility may have mixed with rainwater and leaked outdoors. QST stated that as of the 13th, an estimated 2,000 to 3,000 liters of liquid waste had accumulated in the relevant underground storage tanks. After investigating water bodies around the tanks, the institute confirmed that detected radioactive material concentrations were below standard values, and no environmental impact has been indicated so far. QST reported the incident to national and local governments the following day and plans to submit preventive measures to the Nuclear Regulation Authority of Japan.

2026-08-18

South Korea's domestically developed lunar radiation detector to travel to the Moon aboard NASA commercial lunar lander

South Korea's domestically developed lunar radiation detector to travel to the Moon aboard NASA commercial lunar lander

The Korea AeroSpace Administration (KASA) announced on August 17 that the Lunar Space Radiation Detector (LVRAD), independently developed by South Korea, will be mounted on a lander under NASA's Commercial Lunar Payload Services (CLPS) program to conduct observations of the radiation environment on the lunar south pole surface. The two sides signed the relevant implementation agreement on August 14. Under the agreement, KASA plans to complete the development of the flight model of the detector by next year and deliver the equipment to the United States in accordance with the NASA lunar lander mission schedule. NASA will be responsible for integrating the Korean-developed detector onto the commercial lunar lander and supporting its operation and data transmission on the lunar surface after launch. LVRAD consists of...

2026-08-17

Morocco Conducts 18 Expert Missions with IAEA in 2025, Civil Nuclear Cooperation Expands to African Level

Morocco Conducts 18 Expert Missions with IAEA in 2025, Civil Nuclear Cooperation Expands to African Level

Morocco's cooperation with the International Atomic Energy Agency is shifting from mere technical assistance to more active participation in regional capacity building. In 2025, Moroccan experts completed 18 international expert missions under the IAEA Technical Cooperation framework, with the agency's assistance to Morocco reaching €1.17 million in the same year. This indicates that Morocco has established a certain foundation in nuclear science, nuclear technology applications, and regulatory capabilities, and is beginning to play a more significant role in Africa's nuclear technology cooperation network. The National Center for Energy, Nuclear Science and Nuclear Technology in Rabat was granted the status of IAEA Collaborating Centre in September 2024, with a cooperation cycle covering 2025 to...

2026-08-15

CGN Dasheng Launches BV Cable X-Ray Thickness Gauge for Full Online Inspection of Cable Insulation Layers

CGN Dasheng Launches BV Cable X-Ray Thickness Gauge for Full Online Inspection of Cable Insulation Layers

CGN Dasheng Accelerator Technology Co., Ltd. recently announced that its BV cable X-ray thickness gauge can be used for online inspection of insulation layers during cable production. The system employs X-ray technology to perform real-time measurement of key parameters such as cable outer diameter, inner diameter, wall thickness, eccentricity, and concentricity, replacing the potential detection blind spots inherent in traditional sampling inspection methods. In cable production, insulation layer thickness directly affects product safety and material utilization. Traditional inspection typically relies on sample cutting, manual measurement, and recording, with limited inspection frequency. If issues such as uneven wall thickness or eccentricity occur during production, they are often difficult to detect in a timely manner, which also hinders subsequent quality traceability and process adjustment. According to the company, the equipment...

2026-08-14

Russian Scholars Discuss Prospects and Limitations of Low-Dose Ionizing Radiation in Agriculture

Russian Scholars Discuss Prospects and Limitations of Low-Dose Ionizing Radiation in Agriculture

Russian researchers have recently proposed a rapid bacterial detection method for determining optimal doses of ionizing radiation for animals. Related studies suggest that low-dose radiation in the range of tens to hundreds of milligrays (mGy) may activate physiological processes such as metabolism, growth, and biomass accumulation, offering new technical approaches for livestock farming, veterinary medicine, and related fields. The ionizing radiation food processing center at the L.Ya. Karpov Institute of Physical Chemistry in Obninsk. Photo: Kaluga Region State Television and Radio Broadcasting Company. In response to this direction, the National Research Nuclear University MEPhI (Moscow Engineering Physics Institute)...

2026-08-13

Shimane Nuclear Power Station Unit 2 completes containment vessel-related repairs, scheduled to resume commercial operation on the 16th of next month

Shimane Nuclear Power Station Unit 2 completes containment vessel-related repairs, scheduled to resume commercial operation on the 16th of next month

The Shimane Nuclear Power Station Unit 2, located in Matsue City, Japan, is scheduled to resume commercial operation next month. Recently, part of the reactor containment vessel repair work at the unit was opened to the public, showcasing key construction steps before the resumption of operation. Unit 2 of the Shimane Nuclear Power Station resumed operation in December two years ago. Since February this year, the unit has been shut down for routine operational inspections. In accordance with relevant legal requirements, nuclear power units must undergo equipment disassembly inspections and replacement of related components within 13 months after the previous inspection is completed. On August 3, a dedicated crane was used on site to lift a cover weighing approximately 60 tons to the top of the reactor containment vessel. Workers completed the tightening of 120 bolts that day...

2026-08-13

Baidu
map