Search Results
Keyword:routine inspection
Southwest Supervision Station of the Ministry of Ecology and Environment Conducts 2026 Annual Routine Inspection of CNNC Sichuan Environmental Protection: Strengthening Safety Supervision of Nuclear Facility Decommissioning and Radioactive Waste Disposal
Recently, the Southwest Nuclear and Radiation Safety Supervision Station of the Ministry of Ecology and Environment (Southwest Supervision Station), in accordance with its annual supervision and inspection work plan, officially launched the 2026 annual comprehensive routine inspection of nuclear and radiation safety at CNNC Sichuan Environmental Protection Engineering Co., Ltd. This inspection strictly follows the principles of precision, science, and law-based administration. The Southwest Supervision Station, drawing on past regulatory practices and historical rectification items, targeted core risk areas of the operating unit, including radioactive waste management in aging nuclear facility decommissioning projects, implementation of environmental protection measures, the quality assurance system of in-service treatment facilities, and the execution of institutional procedures. The inspection team strictly referenced the national supervision and inspection outline, Safety Analysis Report (SAR...
2026-10-11
Shimane Nuclear Power Station Unit 2 completes containment vessel-related repairs, scheduled to resume commercial operation on the 16th of next month
The Shimane Nuclear Power Station Unit 2, located in Matsue City, Japan, is scheduled to resume commercial operation next month. Recently, part of the reactor containment vessel repair work at the unit was opened to the public, showcasing key construction steps before the resumption of operation. Unit 2 of the Shimane Nuclear Power Station resumed operation in December two years ago. Since February this year, the unit has been shut down for routine operational inspections. In accordance with relevant legal requirements, nuclear power units must undergo equipment disassembly inspections and replacement of related components within 13 months after the previous inspection is completed. On August 3, a dedicated crane was used on site to lift a cover weighing approximately 60 tons to the top of the reactor containment vessel. Workers completed the tightening of 120 bolts that day...
2026-08-13