Search Results

Keyword:SPIC

The first concrete pouring for the nuclear island of Unit 2 of State Power Investment Corporation (SPIC) Guangxi Bailong Nuclear Power Project was successfully completed.

The first concrete pouring for the nuclear island of Unit 2 of State Power Investment Corporation (SPIC) Guangxi Bailong Nuclear Power Project was successfully completed.

The first concrete pouring for the nuclear island of Unit 2 of SPIC Guangxi Bailong Nuclear Power Project was completed at 16:07 on September 30, after 69 hours and 40 minutes of continuous work. A total of 6,732.5 cubic meters of concrete was used for this pouring, marking another important milestone for the project after the FCD achievement for the nuclear island of Unit 1. Phase I of the Bailong Nuclear Power Project plans to build two CAP1000 nuclear power units. These two units adopt independently designed and domestically manufactured Generation III passive nuclear power technology, with each unit having a capacity of up to 1.25 million kilowatts. At present, Unit 1 has entered the construction and installation stage, and the steel containment vessel bottom head, CA20, CV1R, CA01...

2026-09-30

SPIC Holds Mobilization and Deployment Meeting on Further Deepening Reform

SPIC Holds Mobilization and Deployment Meeting on Further Deepening Reform

On September 29, SPIC held a mobilization and deployment meeting on further deepening reform in Beijing, to thoroughly study and implement General Secretary Xi Jinping's important expositions on the reform and development of state-owned enterprises and Party building, fully implement the decisions and arrangements of the CPC Central Committee and the State Council as well as a series of work requirements of the State-owned Assets Supervision and Administration Commission of the State Council, unify thinking, clarify tasks, and consolidate responsibilities, solidly advance the Group's new round of reform breakthroughs, and empower high-quality corporate development through reform. Liu Mingsheng, Secretary of the Party Leadership Group and Chairman of the Group, attended the meeting and delivered a speech; Tian Yongzhong, Director and Deputy Secretary of the Party Leadership Group, attended the meeting; Liu Feng, Member of the Party Leadership Group and Vice President, presided over the meeting; Group leaders Chen Haibin, Gao Boyu, and Yan Hang attended the meeting. The meeting pointed out...

2026-09-30

SPIC Holds a Symposium for Non-Party Representative Figures

SPIC Holds a Symposium for Non-Party Representative Figures

On September 29, SPIC held a symposium for non-Party representative figures to thoroughly study and implement General Secretary Xi Jinping's important thought on doing a good job in the Party's united front work in the new era and the spirit of his important speech at the symposium with non-Party figures, to solidly advance the implementation of the decisions and arrangements of the CPC Central Committee on united front work and the relevant work requirements of the Party Committee of SASAC, and to contribute SPIC's strength to the advancement of Chinese modernization. Liu Mingsheng, Secretary of the Leading Party Members Group and Chairman of SPIC, attended the meeting and delivered a speech. Tian Yongzhong, Director and Deputy Secretary of the Leading Party Members Group, presided over the meeting. The meeting pointed out that General Secretary Xi Jinping's important thought on doing a good job in the Party's united front work in the new era provides the fundamental guideline for doing a good job in united front work on the new journey in the new era and for giving full play to the powerful magic weapon role of the united front.

2026-10-01

The main control room large screen of Unit 1 of SPIC Lianjiang Nuclear Power Project was successfully lit up

The main control room large screen of Unit 1 of SPIC Lianjiang Nuclear Power Project was successfully lit up

On September 28, the main control room large screen of Unit 1 of SPIC Lianjiang Nuclear Power Project was successfully lit up, marking that the unit construction has entered a new stage and laying a solid foundation for the subsequent cold test, hot test, and high-quality commissioning. The main control room is the control center of a nuclear power plant, mainly including important equipment such as the unit operation operator workstations and related control panels. It is the "brain" of the nuclear power plant and undertakes the core functions of unit operation monitoring, organization, and command.

2026-09-29

SPIC Releases Its First Fully Independent Full-Scope Simulator and Related Independent Technologies in Beijing

SPIC Releases Its First Fully Independent Full-Scope Simulator and Related Independent Technologies in Beijing

On September 28, SPIC released its first fully independent full-scope simulator and related independent technologies in Beijing, announcing that State Power Investment Corporation (SPIC) has mastered complete full-scope simulator R&D and supply capabilities. A full-scope simulator is like a mirror of a nuclear power plant; operators performing control actions in the full-scope simulator receive realistic feedback in real time. With the help of this "digital nuclear power plant without nuclear accident hazards," operators repeatedly hone their daily operational control and accident handling skills, becoming professionals who ensure the safe and efficient operation of real nuclear power plants. To ensure the training quality of main control room operators at nuclear power plants, the SPIC Central Research Institute took the lead, together with State Nuclear Power Automation System Engineering Company (SNPAS) and State Nuclear Power Demonstration Plant (SNPDP)...

2026-09-28

Unit 2 of State Power Investment Corporation (SPIC) Guangxi Bailong Nuclear Power Project starts construction

Unit 2 of State Power Investment Corporation (SPIC) Guangxi Bailong Nuclear Power Project starts construction

At 18:27 on September 27, the nuclear island of Unit 2 of State Power Investment Corporation (SPIC) Guangxi Nuclear Power Bailong Nuclear Power Project began its first concrete pour (FCD), marking that Phase I of the Bailong Nuclear Power Project has shifted from single-unit construction to a new stage of comprehensive dual-unit construction. The FCD for Unit 2 of the Bailong Nuclear Power Project adopted a single-side pushing continuous one-time integral pouring method, with approximately 6,637 cubic meters of concrete planned to be poured over approximately 58 hours. In view of the multiple overlapping construction difficulties such as the large bottom slab size, irregular shape, and high difficulty of temperature control and curing, the project team prepared a special construction plan in advance and implemented all-round safeguard measures. The single-side pushing pouring path and process parameters were optimized, and the owner, supervisor and general contractor exercised full-process on-site supervision and control

2026-09-28

Signed Article by Liu Mingsheng, Chairman and Party Secretary of State Power Investment Corporation (SPIC)

Signed Article by Liu Mingsheng, Chairman and Party Secretary of State Power Investment Corporation (SPIC)

Seizing the High Ground of Future Energy, Accelerating the Pace of Green Transformation Liu Mingsheng, Chairman and Party Secretary of State Power Investment Corporation (SPIC) At present, a new round of technological revolution is converging historically with the green, low-carbon transformation of energy, and future industries are becoming a strategic battleground for reshaping the global competitive landscape. General Secretary Xi Jinping's series of important remarks on future industries, made from the strategic height of advancing the building of a strong nation and the great cause of national rejuvenation, provide important guidance for developing future industries, building a modern industrial system, and grasping the initiative in development. As the world's largest clean energy power generation enterprise, SPIC has always regarded the development of future industries as a strategic lever for safeguarding the nation's long-term energy security and winning the initiative in development...

2026-08-31

SPIC Thorium-Based Energy Technology Company Visits College of Nuclear Science and Technology at Harbin Engineering University for Cooperation Exchange

SPIC Thorium-Based Energy Technology Company Visits College of Nuclear Science and Technology at Harbin Engineering University for Cooperation Exchange

On August 20, Tang Chuntao, interim head of the Overall Technology Department and R&D Design Department of SPIC Thorium-Based Energy Technology Co., Ltd., led a delegation to the College of Nuclear Science and Technology at Harbin Engineering University for an exchange meeting. The two sides discussed topics including technical breakthroughs, research collaboration, and talent cultivation related to the National Major Science and Technology Project on thorium molten salt reactors. Dean Tan Sichao and Vice Dean Xia Genglei attended the meeting. Tan Sichao welcomed Tang Chuntao and his delegation. He noted that the College of Nuclear Science and Technology, leveraging the university's distinctive advantages in the "Three Seas and One Nuclear" strategy, has established a multidisciplinary layout in nuclear engineering, nuclear technology, and nuclear chemical engineering with deep academic accumulation. As the sole entity of SPIC Group for the thorium fuel cycle, Thorium-Based Energy Company undertakes the R&D and construction of advanced Generation IV nuclear energy systems. The two sides have complementary strengths and broad prospects for cooperation. He expressed hope that this exchange would serve as an opportunity to deepen joint research, platform co-construction, and talent co-cultivation, jointly serving the nation's high-quality nuclear energy development.

2026-08-24

SPIC Shandong Nuclear Power's Total Intellectual Property Achievements Surpass 1,000

SPIC Shandong Nuclear Power's Total Intellectual Property Achievements Surpass 1,000

Recently, the total intellectual property achievements of SPIC Group Shandong Nuclear Power surpassed 1,000, and the company was also recognized as a "Yantai Intellectual Property Advantage Enterprise." It is reported that these 1,000 achievements include over 800 patents (including 5 international patents), 194 software copyrights and work copyrights, and 3 registered trademarks. Focusing on the new scenario of nuclear energy heating, Shandong Nuclear Power has formed over 100 patent achievements covering key areas such as system design, equipment optimization, and operation control, promoting clean nuclear energy's transition from power generation to heating, and creating China's first nuclear energy comprehensive utilization brand, "Nuanhe No.1." Focusing on the technical breakthrough of reheat control valves in the conventional island under the large-scale heating scenario of AP/CAP1000 pressurized water reactor nuclear power plants, the company has overcome key technical challenges and formed a series of patent achievements, supporting the innovative development of nuclear power equipment. The main pump frequency converter is known as the "heart" of nuclear power operation. Around its technical breakthroughs, the company has established a patent portfolio, driving control optimization and equipment reliability improvement, providing strong support for innovation in nuclear power equipment.

2026-08-17

SPIC Haiyang Nuclear Power Unit 3 Hot Functional Test Successfully Completed

SPIC Haiyang Nuclear Power Unit 3 Hot Functional Test Successfully Completed

At 17:30 on August 13, the hot functional test (HFT) of Unit 3 at SPIC Shandong Nuclear Power Haiyang Nuclear Power Plant was successfully completed, laying a solid foundation for subsequent fuel loading and first grid connection of the unit. ▲Aerial view of Shandong Nuclear Power Haiyang Nuclear Power Plant. The hot functional test is the most critical non-nuclear comprehensive verification phase before nuclear fuel loading, often referred to as the "final exam" or "mock exam" before a nuclear power plant officially generates electricity. By executing a series of tests simulating actual operating conditions within the pressure and temperature ranges of normal reactor operation, it comprehensively verifies the reliability of nuclear island and conventional island systems and equipment under hot operating conditions, ensuring that relevant parameters meet design requirements. ▲On July 4, during the normal residual heat removal system (RNS) test at the heat-up platform of the hot functional test...

2026-08-15

SPIC Nuclear Conventional Island Quality Supervision Sub-station Conducts Pre-FCD Supervision and Inspection on Unit 2 of Guangxi Bailong Nuclear Power Plant

SPIC Nuclear Conventional Island Quality Supervision Sub-station Conducts Pre-FCD Supervision and Inspection on Unit 2 of Guangxi Bailong Nuclear Power Plant

Recently, the Nuclear Conventional Island Engineering Quality Supervision Sub-station of State Power Investment Corporation (hereinafter referred to as the SPIC Sub-station) completed the first and pre-FCD quality supervision and inspection of the conventional island of Unit 2 of Phase I of the Guangxi Bailong Nuclear Power Plant. The inspection adopted a cross-supervision model, coordinated by the Nuclear Conventional Island Engineering Quality Supervision Station, with the directly affiliated project station organizing a supervision team of senior industry experts, and the SPIC Sub-station providing full coordination and support throughout the process. This initiative aims to break long-standing inertial thinking and leverage external perspectives to identify management blind spots and quality hazards that may have been overlooked. Yin Jingfeng, Executive Deputy Director of the Nuclear Conventional Island Engineering Quality Supervision Group, attended the event and made work arrangements, with project leaders from the construction unit and all participating units fully involved in the supervision and inspection.

2026-08-11

"1455" System Officially Goes Live at SPIC Zhanjiang Nuclear Power

"1455" System Officially Goes Live at SPIC Zhanjiang Nuclear Power

The "1455" project is the abbreviated name of the SPIC Group's "1455" World-Class Financial Management System Construction Project. Built on SAP ERP as its foundation, with treasury management as the breakthrough point and contracts as the main thread, the "1455" project adopts a strategy of "pilot rooms first, then full-scale rollout," leveraging digital and intelligent empowerment and value-driven approaches to comprehensively achieve business-finance integration and drive the Group's overall digital and intelligent transformation and upgrade. In accordance with the Group's unified deployment, on August 8, the "1455" system was officially launched at Zhanjiang Nuclear Power. The company's core business modules including finance, materials, projects, and contracts have been formally migrated to this platform for daily operations, marking a new milestone in the company's business-finance integration and digital management capabilities, injecting strong momentum for the Group's "balanced growth strategy" to take root and deliver results in Zhan...

2026-08-10

SPIC Archives Management Project Selected for National Archives Administration AI Application Pilot

SPIC Archives Management Project Selected for National Archives Administration AI Application Pilot

On July 29, the National Archives Administration issued the "Notice on Announcing AI Application Pilot Projects." The archives management AI application pilot project submitted by State Power Investment Corporation (SPIC) stood out from 253 pilot projects and was successfully selected, thanks to its solid digitalization foundation for archives, clear AI integration implementation roadmap, and distinctive application scenarios characteristic of central energy enterprises, becoming an important practical vehicle for digital transformation of archives in central enterprises. In April this year, to safely, steadily, and orderly promote the application of AI in the archives industry, the National Archives Administration issued the "Notice on Carrying Out AI Application Pilot Work," requiring pilot efforts in five aspects: computing power, models, data, scenarios, and security...

2026-08-10

SPIC Signs Strategic Cooperation Agreement with Shandong Provincial Government

SPIC Signs Strategic Cooperation Agreement with Shandong Provincial Government

On August 7, SPIC and the Shandong Provincial Government signed a strategic cooperation agreement in Jinan. Prior to the signing, Liu Mingsheng, Secretary of the Party Leadership Group and Chairman of SPIC, held working talks with Lin Wu, Secretary of the Shandong Provincial Party Committee and Chairman of the Standing Committee of the Provincial People's Congress. Zhou Naixiang, Deputy Secretary of the Shandong Provincial Party Committee and Governor of the Province, together with Liu Mingsheng, witnessed the signing of the strategic cooperation agreement. Zhang Haibo, Member of the Standing Committee of the Shandong Provincial Party Committee and Executive Vice Governor, Shan Yi, Member of the Standing Committee and Secretary-General of the Provincial Party Committee, and Lu Hongzao and Chen Haibin, Members of the Party Leadership Group and Vice Presidents of SPIC, attended the events. Lin Wu, on behalf of the Shandong Provincial Party Committee and the Provincial Government, expressed gratitude to SPIC for its long-term strong support for Shandong's development and introduced the province's economic...

2026-08-10

Liu Mingsheng, Party Secretary and Chairman of SPIC, Conducts Research Visit to SPIC Laiyang

Liu Mingsheng, Party Secretary and Chairman of SPIC, Conducts Research Visit to SPIC Laiyang

On August 6, Liu Mingsheng, Party Secretary and Chairman of State Power Investment Corporation (SPIC), conducted a research visit to SPIC Laiyang, where he conveyed and studied the spirit of the State Council Executive Meeting held on July 31, inspected the site of the Laiyang Nuclear Power Project, and chaired a research symposium. Liu Mingsheng affirmed the overall work approach of SPIC Laiyang. Liu Mingsheng pointed out that Laiyang Nuclear Power, as the first implementation project for the standardization and batch construction of "Guohe No.1", is of extremely significant importance to the Group's high-quality development of nuclear power. It is essential to conscientiously implement the spirit of the State Council Executive Meeting on July 31, construct and operate nuclear power units in accordance with the world's highest safety standards, always adhere to the principle of "safety first, quality first", prioritize nuclear safety at the highest level, and ensure absolute safety in nuclear operations. It is necessary to unify thinking, strengthen confidence, scientifically grasp opportunities and challenges, continuously enhance the maturity of the "Guohe No.1" reactor design, accelerate the improvement of its competitiveness, strengthen nuclear power construction management capabilities and talent team development, build the Laiyang Nuclear Power Project to high standards and high quality, polish the "Guohe No.1" brand, develop replicable and scalable management models and experience, and promote large-scale development.

2026-08-08

Baidu
map