Search Results

Keyword:Safe

Framatome and EDF Renew Long-Term Operations and Maintenance Service Agreement for Sizewell B Nuclear Power Station, Safeguarding the UK's Only PWR Unit's Life Extension into the 2040s

Framatome and EDF Renew Long-Term Operations and Maintenance Service Agreement for Sizewell B Nuclear Power Station, Safeguarding the UK's Only PWR Unit's Life Extension into the 2040s

Framatome of France and Électricité de France (EDF) have recently formally renewed a 15-year Long-Term Service Agreement (LTSA). The agreement will comprehensively cover integrated routine operations and maintenance as well as refueling outage services for Sizewell B Nuclear Power Station (Sizewell B NPP) in Suffolk, UK, to support the unit's ongoing long-term operation and life extension development strategy. Framatome has been continuously responsible for core overhaul and technical maintenance work at Sizewell B since 2008. The renewed long-term service contract extends directly to 2040, and Framatome will mobilize its global technical expertise in the pressurized water reactor (PWR) field and its UK-dedicated...

2026-10-10

North China Regional Office of Nuclear and Radiation Safety Supervision of the Ministry of Ecology and Environment Conducts Inspections of Key Nuclear Technology Utilization Units

North China Regional Office of Nuclear and Radiation Safety Supervision of the Ministry of Ecology and Environment Conducts Inspections of Key Nuclear Technology Utilization Units

In order to firmly safeguard the nuclear and radiation safety barrier in the capital region, the North China Regional Office of Nuclear and Radiation Safety Supervision of the Ministry of Ecology and Environment (hereinafter referred to as the North China Supervision Office) recently carried out safety inspections of 4 key nuclear technology utilization units in the capital, including source-related units and radioisotope production units. The inspection team went deep into frontline workplaces such as radioisotope production lines and radioactive source storage warehouses, conducted on-site inspections of the operation of radiation safety protection facilities, and carried out key verification of the emergency supplies equipped by each unit and holiday duty arrangements, strictly and practically investigating various types of safety hazards. The North China Supervision Office required all units to further raise their political stance, always keep the string of safety taut, strengthen...

2026-10-10

Zhuanghe Nuclear Power convenes the fourth meeting of the Safety Committee in 2026 and the work safety situation analysis meeting

Zhuanghe Nuclear Power convenes the fourth meeting of the Safety Committee in 2026 and the work safety situation analysis meeting

Recently, Zhuanghe Nuclear Power convened the fourth meeting of the Work Safety Committee in 2026 and the work safety situation analysis meeting. Wang Shuang, Secretary of the Party Committee, Chairman of the company, and Director of the Safety Committee, presided over the meeting. Members of the company's leadership team and heads of relevant departments or authorized persons attended the meeting. The meeting thoroughly studied Xi Jinping Thought on Ecological Civilization and the spirit of General Secretary Xi Jinping's important instructions and directives on work safety, conveyed the spirit of meetings and documents from higher-level units, analyzed and assessed the work safety situation in the fourth quarter, and made work arrangements. The meeting emphasized that all cadres and employees must adhere to the working principles of "strengthen precise control, advance with high standards, and implement in a down-to-earth manner," strictly implement the "ten prohibitions" for on-site operations, tighten and consolidate responsibilities...

2026-10-09

U.S. Department of Energy Plans to Provide Vistra with $4.2 Billion Conditional Loan to Support Power Uprates and Life Extensions at Operating Nuclear Plants: Safeguarding Nearly 4 GW of Baseload Power to Meet Surging Electricity Demand from AI Data Centers

U.S. Department of Energy Plans to Provide Vistra with $4.2 Billion Conditional Loan to Support Power Uprates and Life Extensions at Operating Nuclear Plants: Safeguarding Nearly 4 GW of Baseload Power to Meet Surging Electricity Demand from AI Data Centers

The U.S. Department of Energy (DOE) announced a conditional loan commitment of up to $4.2 billion to Vistra Corp., an independent power producer headquartered in Irving, Texas. The funds will be dedicated to financing power uprates and equipment modernization projects at three of Vistra's nuclear power plants located in Pennsylvania and Ohio——Beaver Valley, Davis-Besse, and Perry——to meet the explosive growth in electricity demand driven by artificial intelligence and data centers. According to the project plan, this technical upgrade project is expected to add a cumulative 433 megawatts (MW) of nuclear generating capacity, and...

2026-10-08

Urenco Officially Commissions Uranium Oxide Storage Facility at Gronau, Germany: Deepening Long-Term Safe Management of Depleted Uranium By-Products

Urenco Officially Commissions Uranium Oxide Storage Facility at Gronau, Germany: Deepening Long-Term Safe Management of Depleted Uranium By-Products

Global nuclear fuel enrichment services giant Urenco recently announced the official commissioning of a specialized uranium oxide storage facility located at its Gronau enrichment plant site in North Rhine-Westphalia, Germany. The formal commissioning of this facility marks the completion of a key piece in Urenco's layout for the full lifecycle harmless disposal of depleted uranium tails and strategic resource reserves. The construction permit for this storage facility originated from the expansion approval issued by the North Rhine-Westphalia nuclear regulatory authority to the Gronau enrichment plant in 2005, which authorized the plant's annual enrichment capacity ceiling to reach 4.5 million separative work units (SWU). As a precondition for environmental and nuclear safety regulatory approval, the state government explicitly...

2026-10-08

The North China Regional Office of the Ministry of Ecology and Environment organized the 2026 North China Regional Radiation Safety Regulatory Experience Exchange Activity

The North China Regional Office of the Ministry of Ecology and Environment organized the 2026 North China Regional Radiation Safety Regulatory Experience Exchange Activity

In October 2026, the North China Nuclear and Radiation Safety Supervision Station of the Ministry of Ecology and Environment (hereinafter referred to as the North China Supervision Station) officially organized the 2026 North China Regional Radiation Safety Regulatory Experience Exchange Activity in Shijiazhuang City, Hebei Province, aiming to further deepen the cross-regional collaborative regulatory mechanism for nuclear and radiation safety. Relevant officials from the Nuclear Facility Safety Regulation Department and the Radiation Source Safety Regulation Department of the Ministry of Ecology and Environment made special trips to the site to provide guidance, conducted in-depth exchanges with frontline regulatory representatives from North China and surrounding key provinces, and put forward clear guidance on current and future regulatory directions. During the exchange activity, representatives from Beijing Municipality, Tianjin Municipality, Hebei Province, Shanxi Province, Inner Mongolia Autonomous Region, Shandong...

2026-10-08

Fangchenggang Nuclear Power Phase I Marks 10th Anniversary of Commercial Operation: Two Units Have Cumulatively Supplied Over 160 Billion kWh, with WANO Indicators Achieving Full Marks for Seven Consecutive Years

Fangchenggang Nuclear Power Phase I Marks 10th Anniversary of Commercial Operation: Two Units Have Cumulatively Supplied Over 160 Billion kWh, with WANO Indicators Achieving Full Marks for Seven Consecutive Years

Recently, Phase I of the Fangchenggang Nuclear Power Plant under China General Nuclear Power Group officially ushered in the 10th anniversary of its commercial operation. As the first nuclear power project in western China and in an ethnic minority region, the two million-kilowatt-class pressurized water reactor units at the site have maintained safe and stable operation for ten years since being put into operation. Their WANO composite index has achieved full marks for seven consecutive years, and they have cumulatively delivered over 160 billion kWh of clean electricity to the Beibu Gulf Economic Zone. It is understood that Phase I of the Fangchenggang Nuclear Power Project is located on Qisha Peninsula in Fangchenggang City, Guangxi Zhuang Autonomous Region, and is an important energy backbone project of the national Western Development Strategy. The project planned to build two self-developed CPR1000 pressurized water reactor nuclear power units with a single-unit capacity of 1.08 million kilowatts...

2026-10-04

Cumulative safe power generation of China's Sanmen Nuclear Power Phase I exceeds 150 billion kWh

Cumulative safe power generation of China's Sanmen Nuclear Power Phase I exceeds 150 billion kWh

According to reports, as of 00:00 on October 5, 2026, the cumulative safe power generation of Units 1 and 2 of China's Sanmen Nuclear Power Phase I exceeded 150 billion kWh. It is reported that Sanmen Nuclear Power Phase I is among the world's first AP1000 third-generation nuclear power units to be completed and put into operation, and Unit 1 officially entered commercial operation in 2018. As one of the world's first AP1000 third-generation nuclear power projects, Sanmen Nuclear Power Phase I has exemplary significance in technical verification and the accumulation of operating experience. The AP1000 adopts a passive safety system and is designed to maintain a safe state for an extended period after an accident without relying on external power sources or manual intervention. In terms of environmental benefits, since being put into operation, Sanmen Nuclear Power Phase I has cumulatively saved more than 42 million tons of standard coal and reduced carbon dioxide emissions by more than 110 million tons. This clean electricity is continuously transmitted to East China and the Yangtze River Delta region, helping to promote the low-carbon transformation of the energy structure while ensuring a stable regional power supply. Compared with thermal power of the same scale, nuclear power does not produce atmospheric pollutants such as sulfur dioxide, nitrogen oxides, and soot, and has a long-term effect on improving regional air quality. According to the planning of the Sanmen Nuclear Power Base, construction of the remaining units will also be advanced. After all units at the base are completed, annual power generation can reach 60 billion kWh, which will further enhance the zero-carbon electricity supply capacity of East China and accumulate experience for the large-scale and standardized construction of China's coastal nuclear power bases.

2026-10-05

"Linglong One" Global First-of-a-Kind Unit Enters Hot Functional Testing Sprint Toward Fuel Loading: Hainan Nuclear Power Details Fully Passive Safety and Multi-Layer Defense Logic

"Linglong One" Global First-of-a-Kind Unit Enters Hot Functional Testing Sprint Toward Fuel Loading: Hainan Nuclear Power Details Fully Passive Safety and Multi-Layer Defense Logic

At the Hainan Changjiang Nuclear Power Base, the highly anticipated Linglong One multi-purpose modular small pressurized water reactor global first-of-a-kind demonstration project is in the hot functional testing phase, making an all-out sprint toward the goals of first core nuclear fuel loading and grid-connected power generation within the year. As the world's first onshore commercial modular small reactor to pass the International Atomic Energy Agency's generic safety review, its safety margins and engineering design logic have drawn widespread industry attention. Currently, the civil engineering works of the Linglong One unit have been fully completed, and the installation and commissioning of core main equipment are essentially ready. Following the completion of cold functional testing in October 2025, the ongoing hot functional testing is raising the primary loop system temperature and pressure to near actual rated operating conditions...

2026-10-02

South Korea's Nuclear Safety and Security Commission Holds High-Level Talks with Vietnam: Deepening Nuclear Safety Regulatory Cooperation to Support Restart of Ninh Thuan Nuclear Power Project

South Korea's Nuclear Safety and Security Commission Holds High-Level Talks with Vietnam: Deepening Nuclear Safety Regulatory Cooperation to Support Restart of Ninh Thuan Nuclear Power Project

The Nuclear Safety and Security Commission (NSSC) of South Korea held talks with a high-level Vietnamese delegation on October 1, 2026, in the large conference room in Jongno-gu, Seoul. Choi Wonho, Chairman of the Nuclear Safety and Security Commission of South Korea, Vu Hai Quan, Minister of the Ministry of Science and Technology (MOST) of Vietnam, and Nguyen Hoang Linh, Director General of the Vietnam Agency for Radiation and Nuclear Safety (VARANS), jointly attended the meeting, focusing on the systematic...

2026-10-01

Strengthen Regulation of Fusion Devices, Empower the Development of New Technologies

Strengthen Regulation of Fusion Devices, Empower the Development of New Technologies

Recently, the South China Regional Office of Nuclear and Radiation Safety Supervision of the Ministry of Ecology and Environment (hereinafter referred to as the South China Regional Office) conducted a radiation safety supervision inspection of the J-TEXT tokamak fusion experimental device at Huazhong University of Science and Technology. As the only medium-to-large tokamak experimental device at a university in China, J-TEXT bears the important mission of fusion talent cultivation and frontier physics experiments. The South China Regional Office focused on key aspects including equipment operation, radiation protection, and authorization management, meticulously investigated safety hazards, verified the implementation of safety management systems, and urged Huazhong University of Science and Technology to promptly plug safety loopholes and standardize device operation procedures, effectively building a strong defense line for the safe and stable operation of fusion experimental devices, providing solid support for the orderly conduct of scientific research experiments...

2026-10-01

Taiwan's Nuclear Safety Commission Completes Compliance Review of Maanshan Nuclear Power Plant "Restart Plan"

Taiwan's Nuclear Safety Commission Completes Compliance Review of Maanshan Nuclear Power Plant "Restart Plan"

On September 24, 2026, the Nuclear Safety Commission of the Taiwan region of China officially completed and approved the review of the restart plan for the Maanshan Nuclear Power Plant (the Third Nuclear Power Plant). The Nuclear Safety Commission (referred to as the NSC), Taiwan's nuclear safety regulatory body, officially announced the completion and approval of the review of the restart plan submitted by Taiwan Power Company (Taipower) for the Maanshan Nuclear Power Plant (the Third Nuclear Power Plant). This move marks a key step for the Maanshan Nuclear Power Plant units in the contest between decommissioning and shutdown versus evaluation for life extension. However, the NSC emphasized that this approval only represents recognition of the plan's content at the current stage. For the units to actually restart, they must still pass multiple stringent engineering self-inspections, on-site reviews, and statutory approval procedures. The NSC...

2026-09-30

State Nuclear Electric Power Planning Design & Research Institute Co., Ltd. convened the first Party Committee (enlarged) meeting of 2026 and the second meeting of the 2026 Safety Production and Emergency Management Committee

State Nuclear Electric Power Planning Design & Research Institute Co., Ltd. convened the first Party Committee (enlarged) meeting of 2026 and the second meeting of the 2026 Safety Production and Emergency Management Committee

On September 28, State Nuclear Electric Power Planning Design & Research Institute Co., Ltd. convened the first Party Committee (enlarged) meeting of 2026 and the second meeting of the 2026 Safety Production and Emergency Management Committee. Guided by Xi Jinping Thought on Socialism with Chinese Characteristics for a New Era, the meeting thoroughly studied and implemented Xi Jinping Thought on Ecological Civilization and General Secretary Xi Jinping's important instructions and directives on safety production, fully implemented the relevant work requirements of the Group Company's Safety Production Deployment Enhancement and Third Quarter Safety Risk Control Meeting, comprehensively reviewed the work of the first three quarters, scientifically assessed the current safety development situation, and arranged and deployed key tasks for safety production and ecological environmental protection in the next stage. Wang Chengli, Secretary of the Company's Party Committee, Chairman, and Director of the Safety Committee...

2026-09-30

Guangxi Nuclear Power Holds the 2026 Third-Quarter Nuclear Safety Culture Promotion Studio Joint Exchange Activity

Guangxi Nuclear Power Holds the 2026 Third-Quarter Nuclear Safety Culture Promotion Studio Joint Exchange Activity

To cultivate a solid foundation for nuclear safety culture and promote the exchange and sharing of technical experience among regulatory authorities, owners, and all participating construction parties, the 2026 third-quarter Nuclear Safety Culture Promotion Studio joint exchange activity for the South China Nuclear and Radiation Safety Supervision Station of the Ministry of Ecology and Environment (hereinafter referred to as the "South China Supervision Station"), the Bailong Nuclear Power Project, and the Fangchenggang Nuclear Power Project was recently held at Guangxi Nuclear Power. The activity was chaired by Zheng Tao, head of the on-site supervision group for the Bailong Nuclear Power Project of the South China Supervision Station. Chen Rongda, director of the Third Nuclear Facility Supervision Division of the South China Supervision Station, Li Qiang, general manager of Guangxi Nuclear Power, and Hou Yousheng, general manager of Fangchenggang Nuclear Power, attended the activity, along with representatives from all participating construction units. All parties gathered together to focus on the cultivation and implementation of nuclear safety culture...

2026-09-30

China Nuclear Engineering & Construction Group Co., Ltd. Holds the Fourth Safety Production and Quality Committee (Expanded) Meeting of 2026

China Nuclear Engineering & Construction Group Co., Ltd. Holds the Fourth Safety Production and Quality Committee (Expanded) Meeting of 2026

On September 28, Yin Weiping, Secretary of the Party Committee and Chairman of the Company, and Director of the Safety Production and Quality Committee, presided over the fourth Safety Production and Quality Committee (Expanded) Meeting of 2026. The meeting heard the report on the Company's safety, environmental protection, and quality work in the third quarter, and in response to the current safety and quality management situation and risks, deployed and arranged key fourth-quarter safety and quality breakthrough tasks. The meeting pointed out that the Company currently faces a severe and complex situation in safety and quality, with heavy production and operation tasks in the fourth quarter compounded by seasonal construction risks. All cadres and employees must raise their political stance, maintain clear awareness, continue to firmly build the ideological defense line for safety and quality, and deeply understand the extreme importance and urgency of doing a good job in safety and quality work...

2026-09-30

Baidu
map